Engines
- Engine Model: Honeywell TFE-731-60-1C
- Engine Program EMSP Gold
- Program Cost $581.58/engine/hour
- Engine Serial Numbers: P112394 | P112395 | P112393
- Total Time Since New (hrs): 5,827 | 5,869 | 5,848
- Total Cycles Since New: 2,343 | 2,353 | 2,397
- Time To MPI (hrs): 60 | 66 | 88
- Time To CZI (hrs): 1,173 | 1,131 | 1,152
APU
- APU Model: Honeywell GTCP 36-150(F)
- APU Serial Number: P-407
- Total Time Since New (hrs): 3,411
Avionics
- Primus Elite II Advanced Avionics
- Enrolled on MSPA
- Honeywell CD-830 Control Display Unit
- Honeywell PM-CPDLC
- Push to Load
- Dual Charts
- Synthetic Vision System
- Triple Collins VHF-422C Comms
- CVR with RIPS
- L3 FDR
- Triple Honeywell FMZ-2000 FMS
- Dual Collins HF-9034A w/ SELCAL
- Triple Honeywell Laseref IV
- Triple Collins VIR-432 Navs
- Collins TCAS-4000
- Dual Honeywell TDR-94D Transponder
- Honeywell Primus 880 Weather Radar
- WAAS/LPV
- RAAS
- Honeywell Mark V EGPWS
Additional Features
- Brake Heat Mod
- Aviation Clean Air Filter System
Exterior Features
- Repainted in October 2011 at Standard Aero
- Matterhorn White upper fuselage
- Gamma Gray lower fuselage
- Diamond Silver & Blue Striping
Interior Features
Fourteen (14) Passenger Interior
- The forward cabin features four (4) executive club seating area.
- The mid cabin features two (2) club seats opposite a three (3) place divan.
- The Aft cabin features a four (4) place conference group. A credenza is opposite that features a pop-up kibitzer seat (certified for take-off and landing)
- Forward Galley
- Galley Microwave, Warming Oven and Coffeemaker
- Aft Lavatory
- All soft goods, headliner, sidewalls, and countertops refurbished in Aug of 2020.
- Refurbished Aug 2020 at Standard Aero
Entertainment & Communications
- Baker CMS
- GoGo L5 WiFi
- GoGo Video Processor Unit (GVPU)
Maintenance Status
| Inspections | Due (Hrs) |
|---|---|
| 1B Inspection | 242 Hours |
| 2B Inspection | 242 Hours |
| 3B Inspection | 3,442 Hours |
| 12 Month | May 2026 |
| 24 Month | May 2026 |
| 36 Month | July 2026 |
| 1C/3C Inspection | July 2026 |
| 2C/4C Inspection | June 2026 |
| Landing Gear Overhaul | June 2026 |
Scheduled for 2C, CZI, and Full Paint in April 2026 at Standard Aero